VITANT GROUP has successfully completed the manufacture and installation of metal structures for a four-bay car unloading station with a total weight of 124 tons. The project included the design, manufacture, anti-corrosion treatment, transportation and installation of metal structures, ensuring high reliability and functionality of the facility.

Thanks to high manufacturing precision, high-quality assembly and compliance with all technical standards, the unloading station meets modern requirements for efficiency, safety and durability. The project allowed the customer to optimize logistics processes and increase cargo handling productivity.